Skip to content

Traffic update: Kingsway lane closure

Work by a contractor will close the eastbound curb lane on the Kingsway, between Northern Nissan and Bancroft Drive, on Nov. 18 from 7 a.m. until end of day on Saturday, Nov. 21. Pedestrian access will be maintained.
271114_lane_closure
traffic interruption
Work by a contractor will close the eastbound curb lane on the Kingsway, between Northern Nissan and Bancroft Drive, on Nov. 18 from 7 a.m. until end of day on Saturday, Nov. 21. Pedestrian access will be maintained.

Traffic signal work will be conducted this week on Elgin Street at the intersections of Ste. Anne Road, Beech Street and Elm Street.

Work may cause the traffic signals to be temporarily unavailable or flashing. Police will be on site to assist with traffic control. No lane closures are anticipated.

Comments

Verified reader

If you would like to apply to become a verified commenter, please fill out this form.