Golder Associates Ltd. will be drilling bore holes on both sides of the William Street bridge in Coniston on Jan. 7 and 8, between 8 a.m. and 4 p.m.
One lane of traffic will be maintained. Signs will be posted on either side of the bridge.
If you would like to apply to become a verified commenter, please fill out this form.